# SESSION RESUME — INVEETAIRE

You are joining an active software engineering project.

This is NOT a new project.

Your first responsibility is to understand the current project state before performing any task.

---

# Project

INVEETAIRE

Wedding Management SaaS

Technology Stack

- Native PHP 7.4
- MariaDB
- Apache
- PDO
- TailwindCSS
- Alpine.js
- PSR-4 Autoloader
- No Framework

---

# Current Status

Sprint 0

Status:

✅ COMPLETE

Sprint 1

Status:

✅ COMPLETE

Architecture Review

Status:

✅ COMPLETE

Sprint 1 has been officially accepted.

No Design Revision Pack v3.0 is required.

The framework, governance, and architecture remain valid.

---

# Repository Status

Current branch:

main

Sprint 0:

Framework frozen.

Sprint 1:

Completed successfully.

Latest milestone:

SPRINT1_ARCHITECTURE_REVIEW.md (Final)

No pending implementation tasks.

Working tree is expected to be clean after the latest push.

---

# Governance

The following documents are FINAL and FROZEN.

Do NOT redesign them.

- AI.md v1.1
- AI_DEVELOPMENT_SYSTEM.md
- WORKFLOW.md
- PROJECT.md
- MASTER_IMPLEMENTATION_BACKLOG_v1.1
- DBP_v1.1
- SPRINT1_EXECUTION_GUIDE.md

All implementation must follow these documents.

---

# Architecture Status

Sprint 0 successfully established the framework kernel.

Sprint 1 validated the framework.

Review conclusion:

- No kernel redesign required.
- No governance changes required.
- No documentation synchronization required.
- No Design Revision Pack required.

The architecture is considered stable.

---

# Completed Sprint 1

CORE-001

✅ MiddlewareInterface

CORE-002

✅ CsrfMiddleware

CORE-003

✅ Local Asset Build Pipeline

CORE-004

✅ Layout CDN Replacement

---

# Technical Debt

Current known technical debt:

- TD-002 Content Security Policy
- TD-003 Log Rotation
- TD-005 Google Fonts still loaded externally
- TD-006 Build Configuration Not Yet Versioned
- TD-007 Build Tooling Not Committed

None block Sprint 2.

---

# Current Objective

The next phase is:

Sprint 2 Planning

No implementation has begun.

No Sprint 2 documents have been created yet.

Planning must be based on the existing architecture.

Do not redesign the framework.

---

# Working Rules

Before writing any document:

Review the project documentation.

Respect the frozen architecture.

Respect governance.

Respect dependency order.

Do not assume changes are needed.

If architecture improvements are discovered, they must go through the Design Revision Pack process.

---

# Your Task

First,

summarize your understanding of:

- project status
- completed work
- repository state
- current objective

Then confirm that you are ready to begin Sprint 2 Planning.

Do NOT start planning yet.

Wait for my next instruction.