# DS001A — Brand Alignment Audit

## Objective

A previous AI assistant began implementing DS001 (Couple Portal Brand Alignment), but the session unexpectedly crashed before completion.

Before making ANY code changes, inspect the current project state and determine how much of DS001 has already been implemented.

---

# Project Context

Before making any assessment, read the official branding package located at:

/assets/branding/

Required documents:

- README.md
- brand-colors.md
- design-system.md
- ai_guide.md

These documents are the official source of truth for all branding decisions.

---

# Your Task

Perform a comprehensive audit of the Couple Portal.

Determine which DS001 objectives have already been completed and which remain unfinished.

Do NOT assume the implementation is complete.

Inspect the actual codebase.

---

# Audit Scope

Review:

- layouts
- sidebar
- top navigation
- dashboard
- page headers
- cards
- buttons
- forms
- tables
- badges
- alerts
- empty states
- icon containers
- typography
- spacing
- color hierarchy

---

# Check For

Compare the current implementation against the branding package.

Verify whether:

- Brand colors have been applied consistently.
- Tailwind default colors have been replaced where appropriate.
- Button hierarchy matches the design system.
- Navigation follows the official branding.
- Card styling is consistent.
- Typography hierarchy is consistent.
- Page headers use the official styling.
- Icon containers follow the branding package.
- Accessibility and contrast remain acceptable.
- Visual consistency has been achieved across the Couple Portal.

---

# Constraints

DO NOT modify any files.

DO NOT refactor.

DO NOT clean up code.

DO NOT fix issues yet.

This is an audit only.

---

# Deliverables

Provide:

## 1. Overall Progress

Estimate completion percentage.

Example:

DS001 Progress: 65%

---

## 2. Completed Items

List every objective that appears fully implemented.

---

## 3. Partially Completed Items

List anything that was started but is inconsistent or incomplete.

---

## 4. Remaining Work

List everything still required to finish DS001.

Prioritize by impact.

---

## 5. Files Already Modified

List files that appear to have already been updated during DS001.

---

## 6. Recommendation

Choose ONE:

A. Continue from current state

B. Roll back and restart

Explain why.

Do not perform any implementation yet.